Hello Everybody,
It's been a busy week with Homecoming and all. FTC was able to get out bases finalized and now have started of specifically designing the intake and holding of the foam blocks in the Relic Recovery Challenge. Along with the designs we reached the need of some rails to brace and hold up the stacking pillars on the FTC field. Now we gotta get Toasty fully put back together and get the intake for both Toasty and Moldy fully in CAD so we can start thinking of constructing it. As for FTC we need to get the intake designs finished and see how they can get incorporated into a good base. Have an awesome week guys!
- Adam
The official blog for the Design Group of FIRST Robotics Team 585 from Tehachapi, CA.
Subscribe to:
Post Comments (Atom)
Evolution of the Drive Modules
For our 2017 robot, we were really happy with our aluminum tube drive modules. We designed them to connect to the VersaPlanetary gearbox, w...
-
For our 2017 robot, we were really happy with our aluminum tube drive modules. We designed them to connect to the VersaPlanetary gearbox, w...
-
We are so excited to have shared our holonomic drive code with the FIRST community this year, and are looking forward to potentially using ...
-
Hi everybody! As a recap of this afternoon's meeting, today we were able to first get the concept down for "Relic Recovery,"...
No comments:
Post a Comment